Parish Center Building Update
Progress Notes from Steve
The fire line, which supplies water to the fire hydrants and building sprinklers, has been pressure-tested and approved so the open trenches should be backfilled and capped with asphalt by the time you read this. This will allow the large parking lot to be reopened relieving parking pressure on Sundays.
Digging for utility stubs and footings on the building pad continues with steel rebar and concrete, soon to follow.
We thank everyone for their patience during these last two weeks!